The Barrow County work schedule includes:
•March 5-14 — Etheridge Road, Mt. Moriah Road (both tracks), Auburn-County Line Road (both tracks), Parks Mill Road (both tracks) and Carl-Cedar Hill Road (both tracks) in Auburn and Carl.
•March 19-28 — Deer Trail Run, Bankhead Highway (both tracks), Horton Street (both tracks), Beulah Street (both tracks). South Broad Street (State Route 11), Jackson Street, Athens Street (both tracks), Russell Cemetery Road, Midland Road, Harold Day Road, Pickle Simmons Drive and Giles Road (both tracks) in Winder. The Cedar Creek Road crossing will be skipped.
•April 2-11 — Cash Road (both tracks), Pleasant Hill Road, Dooley Town Road, Mulberry Street, Jefferson Street (SR 211), 8th Street, Glenn Jackson Road, Osceola Street, Burson Street (both tracks) and Fowler Mill Road in Statham. Bowman Mill Road will be skipped.

Tags:

You May Also Like

Meet NFL Draft Prospect Who’s Turning Heads

ATHENS, Ga. — The National Football League will hold its annual draft April 28 ...

Pamela Whitten to Stay at UGA

University of Georgia’s Provost, Pamela Whitten, will stay at UGA. Whitten was elected as ...

2017 Special Election Results

UPDATE (10:16 PM 11/07/17): All results are in. Deborah Gonzalez wins State House seat District ...