The Barrow County work schedule includes:
•March 5-14 — Etheridge Road, Mt. Moriah Road (both tracks), Auburn-County Line Road (both tracks), Parks Mill Road (both tracks) and Carl-Cedar Hill Road (both tracks) in Auburn and Carl.
•March 19-28 — Deer Trail Run, Bankhead Highway (both tracks), Horton Street (both tracks), Beulah Street (both tracks). South Broad Street (State Route 11), Jackson Street, Athens Street (both tracks), Russell Cemetery Road, Midland Road, Harold Day Road, Pickle Simmons Drive and Giles Road (both tracks) in Winder. The Cedar Creek Road crossing will be skipped.
•April 2-11 — Cash Road (both tracks), Pleasant Hill Road, Dooley Town Road, Mulberry Street, Jefferson Street (SR 211), 8th Street, Glenn Jackson Road, Osceola Street, Burson Street (both tracks) and Fowler Mill Road in Statham. Bowman Mill Road will be skipped.

Tags:

You May Also Like

Update: Boo-Le-Bark on The Boulevard

[youtube https://www.youtube.com/watch?v=4YNrugsn2YY&w=560&h=315] The Boulevard Community in Downtown Athens hosted their first annual Boo-Le-Bark on ...

Filling in the Gaps: Infill Housing Debate Continues After 2017 Changes

According to Athens-Clarke County senior planner Bruce Lonnee, an incongruously sized house can literally ...

Today’s Weather

Athens, GA | November 17, 2014 If you are headed out the door this morning, ...