The Barrow County work schedule includes:
•March 5-14 — Etheridge Road, Mt. Moriah Road (both tracks), Auburn-County Line Road (both tracks), Parks Mill Road (both tracks) and Carl-Cedar Hill Road (both tracks) in Auburn and Carl.
•March 19-28 — Deer Trail Run, Bankhead Highway (both tracks), Horton Street (both tracks), Beulah Street (both tracks). South Broad Street (State Route 11), Jackson Street, Athens Street (both tracks), Russell Cemetery Road, Midland Road, Harold Day Road, Pickle Simmons Drive and Giles Road (both tracks) in Winder. The Cedar Creek Road crossing will be skipped.
•April 2-11 — Cash Road (both tracks), Pleasant Hill Road, Dooley Town Road, Mulberry Street, Jefferson Street (SR 211), 8th Street, Glenn Jackson Road, Osceola Street, Burson Street (both tracks) and Fowler Mill Road in Statham. Bowman Mill Road will be skipped.

Tags:

You May Also Like

The Chick-fil-A Chicken Salad: Off the Menu and Into Your Kitchen

Chick-fil-A announced it will discontinue the chicken salad sandwich after September 30, 2017. For ...

College students walk underneath red, white and black balloons and a welcome to UGA sign on campus

Switched Up Schedule: UGA Professors Adjust to Spring Modifications

The 2026 spring semester at the University of Georgia introduced a schedule change, which ...